- continued from previous page. Hi Frank (and the rest of the Hoover fence gang),
The fence is still progressing. Looks like it will be a three section job right now.
We installed the first section over the weekend. We spent a lot of time
learning how to level each section before we put down the concrete. It's a three way level
(height, angle orientation (N,E,S,W), and vertical orientation (bubble center on two axis)
so each post takes some time. We first leveled the height of all posts in the
section by placing blocks and shims under the bottom rail with a string line across the
top rail (each end/gate post was leveled in advance). Next, we leveled each post
orientation with a string line stretched from outside corner to outside corner. For
the vertical alignment we used a standard post hole double level as we concreted each
post. We took extra time but the result is absolutely fantastic, straight and gently
sloping with the land. The gate and end post were routed to compensate for the angle
of the fence. We made a simple jig to maintaiin equal distance from each side as we
routed the post. We forgot to route the top hole of one of the gate posts and had to
"field" route it. The jig was very helpful here.
I have attached a few pictures for your viewing pleasure. Fence5 shows my Dad using his equal
lateral high heel dumb sight method of centering the post. It didn't work so we
moved him back into the garage. Fence6
shows the completion of part 1 of section 1 of the fence (the dog is "Emma", our
adopted stray). Fence7 shows
the completion of part 2 attached to part 1 of section 1 of the fence. Fence8 is an overhead of the completed
section 1.
We start on section 2 tomorrow if it doesn't rain tonight. So far it looks good but
anything can change over night, as you already well know.
Wish us luck,
Mikey
Jump to a Specific Page of this Story:
- Part I - Receiving
the product. Pictures and narrative of how the fence is packaged and shipped.
- Part II - Staking
the fence line and digging the first holes.
- Part III -
Installing the sections, leveling
- Part IV -
Installing gates
- Part V - All done!